The purpose of this page is to provide sufficient information about The Slab Town project such that a contractor can understand the scope and provide a proposal for the work. The Site Plan, also on this web page provides 90% of the information about this project. Other documents such as the soil report, stormwater report and building drawings can be provided on request.
The building is being supplied by Superior Metal Buildings out of Valdosta. The permitting has been performed by the owner. All known permitting has been completed with the exception of the building permit (Planning Department Approval obtained). This includes the stormwater permit and septic permit, The work scope that needs to be captured is further described below. Contractor will need to provide work and supervision for these areas. See download below for more detailed work scope.
Foundation. Provide concrete for 60 x80 red iron building and 20 x20 loading pad. Associated engineering will need to be provided.
Fill and grading as required by Engineering. Provide stormwater system as descrbed in the strormwater report.
As shown on Project Plan.
6 x 8. Sink, toilet, electric hand dryer and window unit type A/C.
12 x 12. 2 windows and window unit type A/C.
Simple plywood counter. 24" wide x 34" high.
See scope document for details
Fencing will be required to be reconfigured according to the site plan.
Placed on the north side of builing according to Septic permit.
Well is completed. Needs electrical and plumbing hookup.
Plumbing for restroom and 4 spigots on exterior of each side of building.
Ensure county easements are met by building and parking placement